PyRank
  • Search
  • PyPI
  • GitHub
  • Insights
  • Compare
  • Advisories
  • Ecosystem
  • About

Earned Value Management Python Packages

Python packages with the GitHub topic earned-value-management. Sorted by monthly downloads, with stars and forks.
arikanatakan
pmcontrols-mcp

MCP server exposing pmcontrols (CPM, PERT, crashing, EVM, earned schedule) as validated tools for AI agents.

401 4 0
arikanatakan
pmcontrols

Project scheduling and earned value control for Python: CPM, PERT with Monte Carlo schedule risk, minimum-cost crashing, EVM and earned schedule. Validated against published reference values.

208 5 0
    • Original data from PyPI, GitHub, and OSV; downloads served through ClickHouse
    • Sources & methodology