Monthly downloads
76
Weekly downloads
15
GitHub stars *
421

Downloads in the 30 and 7 days to October 10, 2026. Refreshed weekly.

Package Information

Latest Version
Requires Python
>=2.7, !=3.0.*, !=3.1.*, !=3.2.*, !=3.3.*, !=3.4.*
Licence
AGPL-3
Last Release
-
Author
Onestein,Odoo Community Association (OCA)
First Release
September 19, 2018
Total Releases
8
No reported malware or high/critical advisories · Details

The current version has no OSV.dev malware reports and no critical or high-severity vulnerabilities.

Package Insights

Score breakdown - each component scores 0-100, weighted by percentage
Maintenance
70
Popularity
66
Adoption
18
Community
100
Provenance
0
How the maintenance status was determined
Last commit
15 days ago
Monthly downloads
76
• Active
Activity within 30 days
Stable
Activity within 31-180 days
Minimal
Activity within 181-365 days, or no activity data
At Risk
No activity for > 365 days, but > 10,000 monthly downloads
Archived
Repository flagged as archived on GitHub
How the popularity category was determined
Monthly downloads
76
Stars
421
Stars per 1k downloads
5539.47
Industry Standard
> 10,000,000 monthly downloads
Hidden Gem
< 0.5 stars per 1k downloads and > 100,000 monthly downloads
Community Favorite
> 5 stars per 1k downloads
Rising Star
Balanced ratio of stars to downloads
• Unknown
Fewer than 1,000 monthly downloads, or no star data
Needs at least 1,000 monthly downloads to classify popularity.
How download momentum is calculated
Week daily avg
2
Month daily avg
3
Momentum
—
((week_daily_avg - month_daily_avg) / month_daily_avg) * 100
Momentum not reported for packages with < 5,000 monthly downloads — percentages are noisy at low volume.
More insights and metrics
Python version support tiers
requires_python
>=2.7, !=3.0.*, !=3.1.*, !=3.2.*, !=3.3.*, !=3.4.*
Cutting Edge
Minimum supported version is 3.14 or newer
Modern
Minimum supported version is 3.11 to 3.13
• Legacy
Supports 3.10 or older (or Python 2)
Unknown
No requires_python specified or unparseable
License categories
License
AGPL-3
Permissive
MIT, Apache, BSD, ISC, Unlicense, CC0, etc.
• Copyleft
GPL, LGPL, AGPL, MPL, EPL, etc.
Proprietary
Commercial, all rights reserved, custom EULAs
Unknown
No license specified, or none of the above match
How the release cadence was determined
Last release
Unknown
Total releases
8
Releases/year
1.0
Rapid
Last release within 365 days and > 12 releases/year
Regular
Last release within 365 days
• Slow
Last release 366-730 days ago
Stalled
Last release > 730 days ago, or no releases
Unknown
No usable release date available
How contributor risk was determined
Contributors
370
Monthly downloads
76
High Load
≤ 2 contributors and ≥ 50,000 monthly downloads
Moderate Load
< 10 contributors and ≥ 500,000 monthly downloads
Low Load
< 25 contributors and ≥ 5,000,000 monthly downloads, or sole maintainer with ≥ 10,000 monthly downloads
• Balanced
Enough contributors for the package's popularity
Unknown
No contributor data available
Engagement
87
 
Issue Burden
30.9
per 1k stars
Discussions
11.9
per 1k stars
Fork Ratio
39.3%
contrib / forks
Stale Release
No
 
PR Velocity
Quiet
 

Weekly Downloads

GitHub Stars *

Repository details

Forks
942
Issues
13
Last Commit
2 weeks ago
Contributors
370
Open PRs
89
Archived
No

Data and sources

Tracking Since
September 26, 2026
Data Updated
October 11, 2026
Data Freshness
Fresh
Sources and methodology